AE Arma Elektropanc LLC | Dubai
Designing, Implementation, Testing & Commissioning of Fire Alarm & Public Address Voice Evacuation System Co-
ordination with Suppliers for Devices like Heat Detector, Smoke Detector, Sounder, Emergency Telephone, and Break
Glass Alarm & Speaker as per regulations and Project requirements.
Installation and testing of BPS (Booster power supply)Beam Detector and BDC panel
Installation testing and commissioning of SACS system
Installation testing and commissioning of FACP panel
Interfacing Fire alarm system with SACS ,BMS ,PLC
Interfacing fire alarm system with Firefighting Fire hose cabinet
Installation, testing and supervision of DDC BMS panels
Installation cabling and termination and testing of VAV and Thermostat
Installation, testing and commissioning of VESDA System
Design and execution of Fiber Optics network.
Preparing the daily progress report of fire alarm and BMS system
Supervising the projects to ensure its execution within the time & cost parameters.
Foreseeing performance bottleneck and taking corrective measures to avoid the same.
Review contract drawings / specification and ignition of field notices / request for information where deficiencies or
ambiguities are identified within contract specification /drawings.
Review of contract design drawing and submit shop drawings
Attending regular meeting with clients, architects and consultant and keeping them informed of site progress.
To supervise and monitor the site labor force through Site Engineers, General Foreman and Supervisors, monitoring
the work of any subcontractors to complete the work as per client satisfaction.
Ensuring timely availability of materials in accordance with the project schedule and quantity & quality of contract
requirement.
Coordinating with the Mechanical and Plumbing services.
Prepare necessary paperwork for the completion of work and get it authorized by the client after their inspection.
Preparing and reviewing the O&M Manuals with the system specialist.
Ensure all the snag works completed before handing over to the client.
Emerging Technologies LLC | Dubai
Leading Electronics/communication Engineers, Supervisors, Site team to implement various ELV systems (Public
Address and Voice Evacuation, Access Control, Intrusion, CCTV, GRMS, Telephony, SCS, SMATV ,Gate barrier
system ,Parking management System IT& Communications, Intercom, systems , Budget Control , Quality Assurance /
Control , Coordination & Operations ▪ Vendor & Materials Management , Computer Skills , Written & Verbal
Communication Skills , Leadership skills , Project Management skills..
Work Experience
Detailed Tasks Performed.
Leading ELV Scope from design to closing phase
Security Systems (Access Control, CCTV)
IT& Communications System
Telephony, Intercom (Audio & Video)
Prepares and develops project pricing.
Coordinates, communicates, and delegates tasks based on project requirements
Ensures the project plan maintains as it has been initiated time and budget wise without deviating
Review technical materials submittals as per specifications requirements
Provide solutions to daily site construction issues
Establish and coordinate time schedule for design and site works
Prepare Testing & Commissioning (T&C) Method Statement
Assist construction team to final handover of the installation
Attends regular meetings with different stakeholders, and suppliers in order to manage their expectation as well to be
informed of changes.
Preparing Quotation According to the BOQ and Drawings.
Develops project objectives by reviewing project proposals and plans, conferring with management and completes
projects by organizing and controlling project elements.
Studies product design, customer requirements performance standards, then determines project specifications.
Presents cost estimates and performance standards.
Determines project responsibilities by identifying project phases and elements; assigning personnel to phases and
elements.
Evaluation/review and approval of Sub contractor’s shop drawings and submittals.
Managing a team of site engineers/supervisors for site works related to the project and draughting team for drawing
& engineering related works.
Preparation of Technical submittals, Material submittals,Work Notifications, Inspection Requests, and all
Documentation works, Drawings, etc. related to the Project.
Coordination of internal and external engineering activities and the interdisciplinary interfaces in close coordination
with the discipline team leaders.
Checking the claims submitted by the suppliers with respective to the actual requirements of the project
/BOQ/Specifications.
Identifying the works out of the scope of works & claiming variations & adding profit to the organization.
Designation authorizes the complete in charge of the site from the day 1 till the end of the project.
Preparation and review of tender documentation.
Costing /Estimation experience in Low Voltage Systems (CCTV, ACS,SCS, SMATV ,Gate Barrier, PABGM & FTTH).
Commissioning & Installation of CCTV, Security Access Control System,
Coordination with consultant and subcontractor’s for engineering and design issues.
Coordinate subcontractor and external suppliers for technical submittal and shop drawing requirements
Execution and supervision of project activities such as drawings, submittals, procurement, follow-ups, manpower
handling, installation, commissioning, handing over etc.
Follow up with sub contractor for material submittals in line with approved schedule.
Monitoring approval of submittals by the consultant.
Reviewing of weekly progress of works and forwarding the same to the main contractor.
Performing inspection for materials delivered by different suppliers, sub contractors and client..
Ensuring that the sub contractor follows approved for ELV works.
Ensuring that the redline drawings, As Built Drawings, O&M Manuals and related documentation is prepared,
reviewed, submitted and approved in a timely manner, in line with the contract.
Monitoring close out of snags raised by the consultant.
Supervise the temporary services items at project close out
Coordinates with Client / Consultant’s representatives for any site instructions and inspection of works. Assign
targets for accomplishments and ensure targets are met on daily basis for all electrical groups at site.
Ensures that all the works done are in accordance with the approved construction drawings, contract documents,
project specifications, and all applicable standards whether local, national or international standards
Hanars Networks Communication LLC | Dubai
Systems Handled,IP CCTV, Access Control, SMATV, PA/BGM System, Gate Barrier , IP Audio/Video Intercom,
Structured Cabling (Copper and Fiber Optics ISP),
Designs Wired solutions network for small/medium & large enterprises.
Prepares the technical solutions to meet the customer requirements.
Design Fiber, SCS & IP/CCTV solutions
Preparing the Technical & financial offer.
Develops presentations and participates in product demonstrations that accurately depict the
benefits of products and solutions.
Conducts technical assessments and translates client needs, issues, and concerns into
comprehensive technical solutions that the business unit is capable of implementing.
Provides technical support to customer support teams in the implementation of certain
solutions.
Monitors client satisfaction and communicates client concerns.
Familiar with concepts or CCTV or fiber optics concepts.
Preparing method statements & Technical submittals.
Perform site survey for documentation and cost estimating of existing systems and building
conditions
Prepare technical specifications, review and evaluate shop drawings and product submittals
Handle responsibilities of preparing design analysis and engineering reports
Checking the layouts produced by Draughtsman’s before the submission
Coordinating with the other building services.
Producing the design for all passive components such as Communication Racks & Data centers as detailed drawings
for Typical installation
Preparation of BOQ, Costing & Quantity Survey with the drawings.
Preparation of Pre-qualification for projects.
Preparation of method statement for execution.
Coordinating fiber related works of Information Transfer System & OTDR Testing works.
Coordinate with Emirates Telecommunication. Directly supervise Splicing team & Fiber Related installation (FTTH)
team activities of section on day to day basic.
Site Co-ordination and full Documentation
Procurement and Coordination with Logistics & Supplier for Material/Equipment shipment and delivery.
Report generation as per project Execution.
Follow up Project Documentation, Shop drawing ,Material Submittal, Method of statement & approval as per Project
Requirement
Huawei Technologies Ltd | Karachi
Responsible for the Commissioning & Configuration of MSAN ,ONU,OSN,MSAG, DSLAM,NGN C -5, GPON
Survey of new sites for NGN C -5, DSLAM, Rectifier, Cabling.
Leading & supervising Operation and Maintenance works of both Optical Fiber and Copper network.
Installation ,Commissioning ,Configuration & Testing 160K IP DSLAM (MA5616)
Responsible for Conducting the Successful Migration over Soft switch C5
Configuration of EMU and Smoking sensors in the Switch room
Responsible for the Successful Migration of STM-1 to STM-4
Responsible for Conduct the Successful PAT of after Completion of Sites
Responsible for attending the meeting with Customer
Managing the team for Mobilization of Sites & Complete the Work task
Co-ordinate with Team for any technical issue & solve on same time
Accountabilities
Supervise &Leading the site installation, commissioning, Configuration PAT of new sites,
Maintaining exchange wise OSP/ Fiber and Test records.
Supervising& Conducting the Splicing of Optical Fiber.
Accomplishments
Successfully handled the operation and maintenance of Cable (Copper and Optical Fiber) network.
Efficiently conducted the Optical Fiber Testing with OTDR and Optical Power Meter Device.
Oil Field Refinery area Major MSAG/FTTH works completed
Efficient work deployment of site done for Fiber networks.
Operation and Maintenance of Both Fiber and Copper networks done.
The worked include all the installation of equipments, cabling end to end patching and testing of these equipments
according to HUAWEI Standards
Installation & Commissioning of MA5600(MA5603),MA5600&MA5603T,MA5616 DSLAM,
DPS Academy
Total Hours: 72
CCTV Security system installation Testing and Commissioning
PEC
Site supervision, installation testing and commission of CCTV ,PABGM,FAS,SCS and Gate barrier system
Installation ,Testing & Commissioning of PABGM System
Installation ,Testing and Commissioning of AVAYA IP Telephone system
PELCO IP CCTV Camera Installation Testing and Commissioning
Structure Cabling System
DU FTTH system ( Cabling installation testing & Commissioning )
Designing, Implementation, Testing & Commissioning of Fire Alarm & Public Address Voice Evacuation System Co-
ordination with Suppliers for Devices like Heat Detector, Smoke Detector, Sounder, Emergency Telephone, and Break
Glass Alarm & Speaker as per regulations and Project requirements.
Installation and testing of BPS (Booster power supply)Beam Detector and BDC panel
Installation testing and commissioning of SACS system
Installation testing and commissioning of FACP panel
Interfacing Fire alarm system with SACS ,BMS ,PLC
Interfacing fire alarm system with Firefighting Fire hose cabinet
Installation, testing and supervision of DDC BMS panels
Installation cabling and termination and testing of VAV and Thermostat
Installation, testing and commissioning of VESDA System
Design and execution of Fiber Optics network.